From portable to high-throughput benchtop devices, real-time nanopore sensing is a new generation of technology uncovering new biology across multiple sectors.
13 December 2024
- Addition of link to MinION Mk1D IT requirements in "Computer requirements and software" and updated link to EPI2ME.
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow Cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during a sequencing run", "Failed to reach target temperature".
12/13/2024
INF_9189_v114_revJ_13Dec2024
English
MinION
13 December 2024
- Addition of link to MinION Mk1D IT requirements in "Computer requirements and software" and updated link to EPI2ME.
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow Cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during a sequencing run", "Failed to reach target temperature".
11/15/2024
INF_9189_v114_revI_20Nov2024
English
GridION
November 2024
- Updated kit content information and image to include new kit format of SQK-NBD114.24 with plated native barcodes.
11/15/2024
INF_9189_v114_revI_20Nov2024
English
MinION
November 2024
- Updated kit content information and image to include new kit format of SQK-NBD114.24 with plated native barcodes.
10/24/2024
INF_9189_v114_revH_24Oct2024
English
GridION
24th October 2024
- Fixed formatting of table in step 4 in "Native barcode ligation".
10/24/2024
INF_9189_v114_revH_24Oct2024
English
MinION
24th October 2024
- Fixed formatting of table in step 4 in "Native barcode ligation".
9/30/2024
INF_9189_v114_revG_30Sept2024
English
GridION
30th September 2024
- Moved protocol out of early access phase, removed early access wording.
9/30/2024
INF_9189_v114_revG_30Sept2024
English
MinION
30th September 2024
- Moved protocol out of early access phase, removed early access wording.
9/30/2024
INF_9189_v114_revG_30Sept2024
English
GridION
30th September 2024
- Removed protocol from early access phase.
9/30/2024
INF_9189_v114_revG_30Sept2024
English
MinION
30th September 2024
- Removed protocol from early access phase.
9/30/2024
INF_9189_v114_revG_14Jun2023
English
GridION
30th September 2024
- Removed protocol from early access phase.
9/30/2024
INF_9189_v114_revG_14Jun2023
English
MinION
30th September 2024
- Removed protocol from early access phase.
3/7/2024
INF_9189_v114_revF_14Jun2023
English
GridION
07th March 2024
- Updated library loading recommendations to 35-50 fmols.
3/7/2024
INF_9189_v114_revF_14Jun2023
English
MinION
07th March 2024
- Updated library loading recommendations to 35-50 fmols.
19th September 2023
- Updated flow cell loading instructions to include light shield installation
- Updated flow cell loading recommendations in the "Adapter ligation and clean-up" step.
19th September 2023
- Updated flow cell loading instructions to include light shield installation
- Updated flow cell loading recommendations in the "Adapter ligation and clean-up" step.
14th August 2023
- Updated the equipment and consumables with both formats of kits which are being shipped.
- Updated the native barcoding ligation step to include instructions for both EDTA concentrations.
- Updated flow cell flushing instructions to include instructions for the bottle format kit.
14th August 2023
- Updated the equipment and consumables with both formats of kits which are being shipped.
- Updated the native barcoding ligation step to include instructions for both EDTA concentrations.
- Updated flow cell flushing instructions to include instructions for the bottle format kit.