From portable to high-throughput benchtop devices, real-time nanopore sensing is a new generation of technology uncovering new biology across multiple sectors.
30th January 2025
In "Adapter ligation and clean-up". the instructions for preparing the LFB or SFB have been changed to: "Thaw either Long Fragment Buffer (LFB) or Short Fragment Buffer (SFB) at room temperature and mix by vortexing. Then spin down and keep at room temperature."
1/30/2025
NBE_9169_v114_revU_30Jan2025
English
GridION
30th January 2025
In "Adapter ligation and clean-up". the instructions for preparing the LFB or SFB have been changed to: "Thaw either Long Fragment Buffer (LFB) or Short Fragment Buffer (SFB) at room temperature and mix by vortexing. Then spin down and keep at room temperature."
1/30/2025
NBE_9169_v114_revU_30Jan2025
English
MinION
30th January 2025
In "Adapter ligation and clean-up". the instructions for preparing the LFB or SFB have been changed to: "Thaw either Long Fragment Buffer (LFB) or Short Fragment Buffer (SFB) at room temperature and mix by vortexing. Then spin down and keep at room temperature."
1/30/2025
NBE_9169_v114_revU_30Jan2025
English
PromethION
30th January 2025
In "Adapter ligation and clean-up". the instructions for preparing the LFB or SFB have been changed to: "Thaw either Long Fragment Buffer (LFB) or Short Fragment Buffer (SFB) at room temperature and mix by vortexing. Then spin down and keep at room temperature."
1/30/2025
NBE_9169_v114_revU_30Jan2025
中文
Flongle
30th January 2025
In "Adapter ligation and clean-up". the instructions for preparing the LFB or SFB have been changed to: "Thaw either Long Fragment Buffer (LFB) or Short Fragment Buffer (SFB) at room temperature and mix by vortexing. Then spin down and keep at room temperature."
1/30/2025
NBE_9169_v114_revU_30Jan2025
中文
GridION
30th January 2025
In "Adapter ligation and clean-up". the instructions for preparing the LFB or SFB have been changed to: "Thaw either Long Fragment Buffer (LFB) or Short Fragment Buffer (SFB) at room temperature and mix by vortexing. Then spin down and keep at room temperature."
1/30/2025
NBE_9169_v114_revU_30Jan2025
中文
MinION
30th January 2025
In "Adapter ligation and clean-up". the instructions for preparing the LFB or SFB have been changed to: "Thaw either Long Fragment Buffer (LFB) or Short Fragment Buffer (SFB) at room temperature and mix by vortexing. Then spin down and keep at room temperature."
1/30/2025
NBE_9169_v114_revU_30Jan2025
中文
PromethION
30th January 2025
In "Adapter ligation and clean-up". the instructions for preparing the LFB or SFB have been changed to: "Thaw either Long Fragment Buffer (LFB) or Short Fragment Buffer (SFB) at room temperature and mix by vortexing. Then spin down and keep at room temperature."
1/30/2025
NBE_9169_v114_revU_30Jan2025
English
Flongle
30th January 2025
In "Adapter ligation and clean-up". the instructions for preparing the LFB or SFB have been changed to: "Thaw either Long Fragment Buffer (LFB) or Short Fragment Buffer (SFB) at room temperature and mix by vortexing. Then spin down and keep at room temperature."
1/30/2025
NBE_9169_v114_revU_30Jan2025
English
GridION
30th January 2025
In "Adapter ligation and clean-up". the instructions for preparing the LFB or SFB have been changed to: "Thaw either Long Fragment Buffer (LFB) or Short Fragment Buffer (SFB) at room temperature and mix by vortexing. Then spin down and keep at room temperature."
1/30/2025
NBE_9169_v114_revU_30Jan2025
English
MinION
30th January 2025
In "Adapter ligation and clean-up". the instructions for preparing the LFB or SFB have been changed to: "Thaw either Long Fragment Buffer (LFB) or Short Fragment Buffer (SFB) at room temperature and mix by vortexing. Then spin down and keep at room temperature."
1/30/2025
NBE_9169_v114_revU_30Jan2025
English
PromethION
30th January 2025
In "Adapter ligation and clean-up". the instructions for preparing the LFB or SFB have been changed to: "Thaw either Long Fragment Buffer (LFB) or Short Fragment Buffer (SFB) at room temperature and mix by vortexing. Then spin down and keep at room temperature."
1/30/2025
NBE_9169_v114_revU_30Jan2025
中文
Flongle
30th January 2025
In "Adapter ligation and clean-up". the instructions for preparing the LFB or SFB have been changed to: "Thaw either Long Fragment Buffer (LFB) or Short Fragment Buffer (SFB) at room temperature and mix by vortexing. Then spin down and keep at room temperature."
1/30/2025
NBE_9169_v114_revU_30Jan2025
中文
GridION
30th January 2025
In "Adapter ligation and clean-up". the instructions for preparing the LFB or SFB have been changed to: "Thaw either Long Fragment Buffer (LFB) or Short Fragment Buffer (SFB) at room temperature and mix by vortexing. Then spin down and keep at room temperature."
1/30/2025
NBE_9169_v114_revU_30Jan2025
中文
MinION
30th January 2025
In "Adapter ligation and clean-up". the instructions for preparing the LFB or SFB have been changed to: "Thaw either Long Fragment Buffer (LFB) or Short Fragment Buffer (SFB) at room temperature and mix by vortexing. Then spin down and keep at room temperature."
1/30/2025
NBE_9169_v114_revU_30Jan2025
中文
PromethION
30th January 2025
In "Adapter ligation and clean-up". the instructions for preparing the LFB or SFB have been changed to: "Thaw either Long Fragment Buffer (LFB) or Short Fragment Buffer (SFB) at room temperature and mix by vortexing. Then spin down and keep at room temperature."
12/27/2024
NBE_9169_v114_revT_27Dec2024
English
Flongle
19 December 2024
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/27/2024
NBE_9169_v114_revT_27Dec2024
English
GridION
19 December 2024
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/27/2024
NBE_9169_v114_revT_27Dec2024
English
MinION
19 December 2024
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/27/2024
NBE_9169_v114_revT_27Dec2024
English
PromethION
19 December 2024
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/27/2024
NBE_9169_v114_revT_27Dec2024
中文
Flongle
19 December 2024
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/27/2024
NBE_9169_v114_revT_27Dec2024
中文
GridION
19 December 2024
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/27/2024
NBE_9169_v114_revT_27Dec2024
中文
MinION
19 December 2024
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/27/2024
NBE_9169_v114_revT_27Dec2024
中文
PromethION
19 December 2024
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/19/2024
NBE_9169_v114_revT_19Dec2024
English
Flongle
19 December 2024
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/19/2024
NBE_9169_v114_revT_19Dec2024
English
GridION
19 December 2024
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/19/2024
NBE_9169_v114_revT_19Dec2024
English
MinION
19 December 2024
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/19/2024
NBE_9169_v114_revT_19Dec2024
English
PromethION
19 December 2024
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/19/2024
NBE_9169_v114_revT_19Dec2024
中文
Flongle
19 December 2024
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/19/2024
NBE_9169_v114_revT_19Dec2024
中文
GridION
19 December 2024
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/19/2024
NBE_9169_v114_revT_19Dec2024
中文
MinION
19 December 2024
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/19/2024
NBE_9169_v114_revT_19Dec2024
中文
PromethION
19 December 2024
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/19/2024
NBE_9169_v114_revS_27Nov2024
English
Flongle
December 2024/January 2025
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/19/2024
NBE_9169_v114_revS_27Nov2024
English
GridION
December 2024/January 2025
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/19/2024
NBE_9169_v114_revS_27Nov2024
English
MinION
December 2024/January 2025
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/19/2024
NBE_9169_v114_revS_27Nov2024
English
PromethION
December 2024/January 2025
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/19/2024
NBE_9169_v114_revS_27Nov2024
中文
Flongle
December 2024/January 2025
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/19/2024
NBE_9169_v114_revS_27Nov2024
中文
GridION
December 2024/January 2025
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/19/2024
NBE_9169_v114_revS_27Nov2024
中文
MinION
December 2024/January 2025
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/19/2024
NBE_9169_v114_revS_27Nov2024
中文
PromethION
December 2024/January 2025
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/19/2024
NBE_9169_v114_revS_27Nov2024
English
Flongle
December 2024/January 2025
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/19/2024
NBE_9169_v114_revS_27Nov2024
English
GridION
December 2024/January 2025
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/19/2024
NBE_9169_v114_revS_27Nov2024
English
MinION
December 2024/January 2025
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/19/2024
NBE_9169_v114_revS_27Nov2024
English
PromethION
December 2024/January 2025
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/19/2024
NBE_9169_v114_revS_27Nov2024
中文
Flongle
December 2024/January 2025
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/19/2024
NBE_9169_v114_revS_27Nov2024
中文
GridION
December 2024/January 2025
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/19/2024
NBE_9169_v114_revS_27Nov2024
中文
MinION
December 2024/January 2025
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
12/19/2024
NBE_9169_v114_revS_27Nov2024
中文
PromethION
December 2024/January 2025
- Addition of links to MinION Mk1D IT requirements in "Computer requirements and software" and user manual alongside MinION Mk1B in "Data acquisition and basecalling", "How to start sequencing".
- Updated link for EPI2ME in "Computer requirements and software", "EPI2ME (optional)".
- Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading the SpotON flow cell" was moved to the middle of the flow cell.
- Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells.
- Updated link for MinION temperature control in "Issues during the sequencing run for Kit 14", "Failed to reach target temperature".
11/14/2024
NBE_9169_v114_revS_20Nov2024
English
Flongle
November 2024
- Updated kit content information and image to include new kit format of SQK-NBD114.24 with plated native barcodes.
11/14/2024
NBE_9169_v114_revS_20Nov2024
English
GridION
November 2024
- Updated kit content information and image to include new kit format of SQK-NBD114.24 with plated native barcodes.
11/14/2024
NBE_9169_v114_revS_20Nov2024
English
MinION
November 2024
- Updated kit content information and image to include new kit format of SQK-NBD114.24 with plated native barcodes.
11/14/2024
NBE_9169_v114_revS_20Nov2024
English
PromethION
November 2024
- Updated kit content information and image to include new kit format of SQK-NBD114.24 with plated native barcodes.
11/14/2024
NBE_9169_v114_revS_20Nov2024
中文
Flongle
November 2024
- Updated kit content information and image to include new kit format of SQK-NBD114.24 with plated native barcodes.
11/14/2024
NBE_9169_v114_revS_20Nov2024
中文
GridION
November 2024
- Updated kit content information and image to include new kit format of SQK-NBD114.24 with plated native barcodes.
11/14/2024
NBE_9169_v114_revS_20Nov2024
中文
MinION
November 2024
- Updated kit content information and image to include new kit format of SQK-NBD114.24 with plated native barcodes.
11/14/2024
NBE_9169_v114_revS_20Nov2024
中文
PromethION
November 2024
- Updated kit content information and image to include new kit format of SQK-NBD114.24 with plated native barcodes.
8/21/2024
NBE_9169_v114_revR_15Sep2022
English
Flongle
21st August 2024
- Removed Early access loading now that kit is in "released" phase.
- Removed reference to duplex sequencing.
- Updated flow cell loading recommendations based off input fragment size.
8/21/2024
NBE_9169_v114_revR_15Sep2022
English
GridION
21st August 2024
- Removed Early access loading now that kit is in "released" phase.
- Removed reference to duplex sequencing.
- Updated flow cell loading recommendations based off input fragment size.
8/21/2024
NBE_9169_v114_revR_15Sep2022
English
MinION
21st August 2024
- Removed Early access loading now that kit is in "released" phase.
- Removed reference to duplex sequencing.
- Updated flow cell loading recommendations based off input fragment size.
8/21/2024
NBE_9169_v114_revR_15Sep2022
English
PromethION
21st August 2024
- Removed Early access loading now that kit is in "released" phase.
- Removed reference to duplex sequencing.
- Updated flow cell loading recommendations based off input fragment size.
8/21/2024
NBE_9169_v114_revR_15Sep2022
中文
Flongle
21st August 2024
- Removed Early access loading now that kit is in "released" phase.
- Removed reference to duplex sequencing.
- Updated flow cell loading recommendations based off input fragment size.
8/21/2024
NBE_9169_v114_revR_15Sep2022
中文
GridION
21st August 2024
- Removed Early access loading now that kit is in "released" phase.
- Removed reference to duplex sequencing.
- Updated flow cell loading recommendations based off input fragment size.
8/21/2024
NBE_9169_v114_revR_15Sep2022
中文
MinION
21st August 2024
- Removed Early access loading now that kit is in "released" phase.
- Removed reference to duplex sequencing.
- Updated flow cell loading recommendations based off input fragment size.
8/21/2024
NBE_9169_v114_revR_15Sep2022
中文
PromethION
21st August 2024
- Removed Early access loading now that kit is in "released" phase.
- Removed reference to duplex sequencing.
- Updated flow cell loading recommendations based off input fragment size.
21st September 2023
- Updated flow cell loading instructions to include light shield installation
- Updated flow cell loading recommendations in the "Adapter ligation and clean-up" step.
- Format change in "Native barcode ligation" step to fix downloaded checklist.
21st September 2023
- Updated flow cell loading instructions to include light shield installation
- Updated flow cell loading recommendations in the "Adapter ligation and clean-up" step.
- Format change in "Native barcode ligation" step to fix downloaded checklist.
21st September 2023
- Updated flow cell loading instructions to include light shield installation
- Updated flow cell loading recommendations in the "Adapter ligation and clean-up" step.
- Format change in "Native barcode ligation" step to fix downloaded checklist.
21st September 2023
- Updated flow cell loading instructions to include light shield installation
- Updated flow cell loading recommendations in the "Adapter ligation and clean-up" step.
- Format change in "Native barcode ligation" step to fix downloaded checklist.
14th August 2023
- Updated the equipment and consumables with both formats of kits which are being shipped.
- Updated the native barcoding ligation step to include instructions for both EDTA concentrations.
- Updated flow cell flushing instructions to include instructions for the bottle format kit.
14th August 2023
- Updated the equipment and consumables with both formats of kits which are being shipped.
- Updated the native barcoding ligation step to include instructions for both EDTA concentrations.
- Updated flow cell flushing instructions to include instructions for the bottle format kit.
14th August 2023
- Updated the equipment and consumables with both formats of kits which are being shipped.
- Updated the native barcoding ligation step to include instructions for both EDTA concentrations.
- Updated flow cell flushing instructions to include instructions for the bottle format kit.
14th August 2023
- Updated the equipment and consumables with both formats of kits which are being shipped.
- Updated the native barcoding ligation step to include instructions for both EDTA concentrations.
- Updated flow cell flushing instructions to include instructions for the bottle format kit.
March 2023
- Updated DNA repair and end-prep step to show the tip for making up an end-prep mastermix before combining the reagents.
- Corrected the expected volumes for pooled samples and the reflected in the AXP volumes.
March 2023
- Updated DNA repair and end-prep step to show the tip for making up an end-prep mastermix before combining the reagents.
- Corrected the expected volumes for pooled samples and the reflected in the AXP volumes.
March 2023
- Updated DNA repair and end-prep step to show the tip for making up an end-prep mastermix before combining the reagents.
- Corrected the expected volumes for pooled samples and the reflected in the AXP volumes.
18th October 2022
- Updated equipment and consumables to remove reference to the NEBNext Companion Module for Oxford Nanopore Technologies Ligation Sequencing
18th October 2022
- Updated equipment and consumables to remove reference to the NEBNext Companion Module for Oxford Nanopore Technologies Ligation Sequencing
18th October 2022
- Updated equipment and consumables to remove reference to the NEBNext Companion Module for Oxford Nanopore Technologies Ligation Sequencing