From portable to high-throughput benchtop devices, real-time nanopore sensing is a new generation of technology uncovering new biology across multiple sectors.
19th September 2023
- Updated flow cell loading instructions to include light shield installation
- Updated flow cell loading recommendations in the "Adapter ligation and clean-up" step.
19th September 2023
- Updated flow cell loading instructions to include light shield installation
- Updated flow cell loading recommendations in the "Adapter ligation and clean-up" step.
19th September 2023
- Updated flow cell loading instructions to include light shield installation
- Updated flow cell loading recommendations in the "Adapter ligation and clean-up" step.
26 July 2023:
- Formatting updates.
- Addition of disclaimer section to the protocol including information on research use only and Tecan Group Ltd. disclaimers.
26 July 2023:
- Formatting updates.
- Addition of disclaimer section to the protocol including information on research use only and Tecan Group Ltd. disclaimers.
26 July 2023:
- Formatting updates.
- Addition of disclaimer section to the protocol including information on research use only and Tecan Group Ltd. disclaimers.
26 June 2023:
- Updated equipment and consumables list with manufacturers recommendations.
- Formatting updates.
- Inclusion of additional tips and recommendations throughout protocol.
- Addition of research use and Tecan disclaimers to the Overview of the protocol.
- Addition of new "Unloading the Tecan DreamPrep NGS worktable" step in the "Automated library preparation" section.
26 June 2023:
- Updated equipment and consumables list with manufacturers recommendations.
- Formatting updates.
- Inclusion of additional tips and recommendations throughout protocol.
- Addition of research use and Tecan disclaimers to the Overview of the protocol.
- Addition of new "Unloading the Tecan DreamPrep NGS worktable" step in the "Automated library preparation" section.
26 June 2023:
- Updated equipment and consumables list with manufacturers recommendations.
- Formatting updates.
- Inclusion of additional tips and recommendations throughout protocol.
- Addition of research use and Tecan disclaimers to the Overview of the protocol.
- Addition of new "Unloading the Tecan DreamPrep NGS worktable" step in the "Automated library preparation" section.
02 June 2023:
- Updated equipment and consumables list with manufacturers recommendations.
- Formatting updates.
- Inclusion of additional tips and recommendations throughout protocol.
02 June 2023:
- Updated equipment and consumables list with manufacturers recommendations.
- Formatting updates.
- Inclusion of additional tips and recommendations throughout protocol.
02 June 2023:
- Updated equipment and consumables list with manufacturers recommendations.
- Formatting updates.
- Inclusion of additional tips and recommendations throughout protocol.
02 June 2023:
- Updated equipment and consumables list with manufacturers recommendations.
- Formatting updates.
- Inclusion of additional tips and recommendations throughout protocol.
02 June 2023:
- Updated equipment and consumables list with manufacturers recommendations.
- Formatting updates.
- Inclusion of additional tips and recommendations throughout protocol.
02 June 2023:
- Updated equipment and consumables list with manufacturers recommendations.
- Formatting updates.
- Inclusion of additional tips and recommendations throughout protocol.