2nd October 2025
- In 'Overview of the protocol', an important note on Kit14 sequencing and duplex basecalling info sheet was removed as this is a Legacy document and its information is no longer applicable.
- In 'Priming and loading the PromethION Flow Cell', the step to remove the flow cell from the fridge was moved to the top of this section and a step to complete a flow cell check was included.
- In 'Data acquisition and basecalling' information on duplex basecalling was removed as it is no longer applicable.
10/4/2023
GDA_9167_v114_revJ_24Aug2022
English
PromethION
4th October 2023
- Updated the format of the final step in the "Adapter ligation and clean-up" step for the checklist
ONT plc is a member of the producer compliance scheme run by ERP UK Ltd, who manage the submission of documentation in support of WEEE compliance for ONT plc’s manufacture and supply of Electrical and Electronic equipment in the UK.