Ligation sequencing gDNA V14 — whole genome amplification (SQK-LSK114) (WAL_9192_v114_revG_20Jan2024)


DateVersionLanguageDeviceChanges
1/20/2025WAL_9192_v114_revG_20Jan2024EnglishGridION
20 January 2025 - Removed Covaris g-Tube from equipment list as it is not used in the method.
1/20/2025WAL_9192_v114_revG_20Jan2024EnglishMinION
20 January 2025 - Removed Covaris g-Tube from equipment list as it is not used in the method.
1/20/2025WAL_9192_v114_revG_20Jan2024EnglishPromethION
20 January 2025 - Removed Covaris g-Tube from equipment list as it is not used in the method.
12/12/2024WAL_9192_v114_revF_12Dec2024EnglishGridION
12 December 2024 - Addition of links to MinION Mk1D IT requirements in "Compatibility of this protocol" and user manual in "Data acquisition and basecalling", "How to start sequencing". - Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell. - Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells. - Updated link for MinION temperature control in "Issues during a sequencing run", "Failed to reach target temperature".
12/12/2024WAL_9192_v114_revF_12Dec2024EnglishMinION
12 December 2024 - Addition of links to MinION Mk1D IT requirements in "Compatibility of this protocol" and user manual in "Data acquisition and basecalling", "How to start sequencing". - Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell. - Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells. - Updated link for MinION temperature control in "Issues during a sequencing run", "Failed to reach target temperature".
12/12/2024WAL_9192_v114_revF_12Dec2024EnglishPromethION
12 December 2024 - Addition of links to MinION Mk1D IT requirements in "Compatibility of this protocol" and user manual in "Data acquisition and basecalling", "How to start sequencing". - Arrow which was previously at the bottom edge of the flow cell in Image 1b "Priming and loading MinION/GridION Flow Cell" was moved to the middle of the flow cell. - Updated link for flow cell returns in "Flow cell reuse and returns" and removed note for flushing flow cells. - Updated link for MinION temperature control in "Issues during a sequencing run", "Failed to reach target temperature".
8/21/2024WAL_9192_v114_revE_26Jul2023EnglishGridION
21st August 2024 - Updated protocol introduction to trimmed down format. - NEBNext® Companion Module v2 for Oxford Nanopore Technologies® Ligation Sequencing (NEB, E7672S or E7672L) is now the recommended reagent module. - Updated the Repair and End-prep method in-line with new recommended reagents. - Updated the Adapter ligation step with new recommended method.
8/21/2024WAL_9192_v114_revE_26Jul2023EnglishMinION
21st August 2024 - Updated protocol introduction to trimmed down format. - NEBNext® Companion Module v2 for Oxford Nanopore Technologies® Ligation Sequencing (NEB, E7672S or E7672L) is now the recommended reagent module. - Updated the Repair and End-prep method in-line with new recommended reagents. - Updated the Adapter ligation step with new recommended method.
8/21/2024WAL_9192_v114_revE_26Jul2023EnglishPromethION
21st August 2024 - Updated protocol introduction to trimmed down format. - NEBNext® Companion Module v2 for Oxford Nanopore Technologies® Ligation Sequencing (NEB, E7672S or E7672L) is now the recommended reagent module. - Updated the Repair and End-prep method in-line with new recommended reagents. - Updated the Adapter ligation step with new recommended method.
August 21st, 2024WAL_9192_v114_revD_26Jul2023EnglishPromethion Download 07th March 2024 - Updated library loading recommendations to 35-50 fmols.
August 21st, 2024WAL_9192_v114_revD_26Jul2023EnglishGridion Download 07th March 2024 - Updated library loading recommendations to 35-50 fmols.
August 21st, 2024WAL_9192_v114_revD_26Jul2023EnglishMinion Download 07th March 2024 - Updated library loading recommendations to 35-50 fmols.
September 19th, 2023WAL_9192_v114_revB_26Jul2023EnglishPromethion Download 1st August 2023 - Kit contents layout has been updated - In priming and loading the flow cell, the flow cell priming mix instructions have been updated
September 19th, 2023WAL_9192_v114_revB_26Jul2023EnglishGridion Download 1st August 2023 - Kit contents layout has been updated - In priming and loading the flow cell, the flow cell priming mix instructions have been updated
September 19th, 2023WAL_9192_v114_revB_26Jul2023EnglishMinion Download 1st August 2023 - Kit contents layout has been updated - In priming and loading the flow cell, the flow cell priming mix instructions have been updated
August 1st, 2023WAL_9192_v114_revA_26Jul2023EnglishPromethion Download -
August 1st, 2023WAL_9192_v114_revA_26Jul2023EnglishGridion Download -
August 1st, 2023WAL_9192_v114_revA_26Jul2023EnglishMinion Download -