Ligation sequencing gDNA V14 - Lambda control (SQK-LSK114)

DateVersion numberLanguageDeviceChanges
Aug 21 2024CDE_9162_v114_revT_29Jun2022EnglishFlongle
21st August 2024 - Updated sample input recommendations with table for different DNA size. - NEBNext® Companion Module v2 for Oxford Nanopore Technologies® Ligation Sequencing (NEB, E7672S or E7672L) is now the recommended reagent module. - Updated the Repair and End-prep method in-line with new recommended reagents. - Updated the Adapter ligation step with new recommended method. - Updated library loading on flow cell recommendations with table for different DNA size.
Aug 21 2024CDE_9162_v114_revT_29Jun2022EnglishGridION
21st August 2024 - Updated sample input recommendations with table for different DNA size. - NEBNext® Companion Module v2 for Oxford Nanopore Technologies® Ligation Sequencing (NEB, E7672S or E7672L) is now the recommended reagent module. - Updated the Repair and End-prep method in-line with new recommended reagents. - Updated the Adapter ligation step with new recommended method. - Updated library loading on flow cell recommendations with table for different DNA size.
Aug 21 2024CDE_9162_v114_revT_29Jun2022EnglishMinION
21st August 2024 - Updated sample input recommendations with table for different DNA size. - NEBNext® Companion Module v2 for Oxford Nanopore Technologies® Ligation Sequencing (NEB, E7672S or E7672L) is now the recommended reagent module. - Updated the Repair and End-prep method in-line with new recommended reagents. - Updated the Adapter ligation step with new recommended method. - Updated library loading on flow cell recommendations with table for different DNA size.
Aug 21 2024CDE_9162_v114_revT_29Jun2022EnglishPromethION
21st August 2024 - Updated sample input recommendations with table for different DNA size. - NEBNext® Companion Module v2 for Oxford Nanopore Technologies® Ligation Sequencing (NEB, E7672S or E7672L) is now the recommended reagent module. - Updated the Repair and End-prep method in-line with new recommended reagents. - Updated the Adapter ligation step with new recommended method. - Updated library loading on flow cell recommendations with table for different DNA size.
August 21st, 2024CDE_9162_v114_revS_31Jul2024EnglishFlongle Download 08 Aug 2024 Added sentence to give LMD fragment length in Introduction to the protocol/Equipment and consumables/Control Expansion (EXP-CTL001) contents "Lambda DNA (LMD) fragment length is 48.5 kb." 31 July 2024 - Changed reagent order addition in Library preparation/Adapter ligation and clean-up; Ligation Adapter (LA) added before Ligation Buffer (LB) and NEBNext Quick T4 Ligase 18th April 2024 - Updated elution step in "Adapter ligation and clean-up" section to specify 10 minute incubation for PromethION branch.
August 21st, 2024CDE_9162_v114_revS_31Jul2024EnglishMinion Download 08 Aug 2024 Added sentence to give LMD fragment length in Introduction to the protocol/Equipment and consumables/Control Expansion (EXP-CTL001) contents "Lambda DNA (LMD) fragment length is 48.5 kb." 31 July 2024 - Changed reagent order addition in Library preparation/Adapter ligation and clean-up; Ligation Adapter (LA) added before Ligation Buffer (LB) and NEBNext Quick T4 Ligase 18th April 2024 - Updated elution step in "Adapter ligation and clean-up" section to specify 10 minute incubation for PromethION branch.
August 21st, 2024CDE_9162_v114_revS_31Jul2024EnglishPromethion Download 08 Aug 2024 Added sentence to give LMD fragment length in Introduction to the protocol/Equipment and consumables/Control Expansion (EXP-CTL001) contents "Lambda DNA (LMD) fragment length is 48.5 kb." 31 July 2024 - Changed reagent order addition in Library preparation/Adapter ligation and clean-up; Ligation Adapter (LA) added before Ligation Buffer (LB) and NEBNext Quick T4 Ligase 18th April 2024 - Updated elution step in "Adapter ligation and clean-up" section to specify 10 minute incubation for PromethION branch.
August 21st, 2024CDE_9162_v114_revS_31Jul2024EnglishGridion Download 08 Aug 2024 Added sentence to give LMD fragment length in Introduction to the protocol/Equipment and consumables/Control Expansion (EXP-CTL001) contents "Lambda DNA (LMD) fragment length is 48.5 kb." 31 July 2024 - Changed reagent order addition in Library preparation/Adapter ligation and clean-up; Ligation Adapter (LA) added before Ligation Buffer (LB) and NEBNext Quick T4 Ligase 18th April 2024 - Updated elution step in "Adapter ligation and clean-up" section to specify 10 minute incubation for PromethION branch.
July 31st, 2024CDE_9162_v114_revR_29Jun2022EnglishFlongle Download 18th April 2024 - Updated elution step in "Adapter ligation and clean-up" section to specify 10 minute incubation for PromethION branch.
July 31st, 2024CDE_9162_v114_revR_29Jun2022EnglishMinion Download 18th April 2024 - Updated elution step in "Adapter ligation and clean-up" section to specify 10 minute incubation for PromethION branch.
July 31st, 2024CDE_9162_v114_revR_29Jun2022EnglishPromethion Download 18th April 2024 - Updated elution step in "Adapter ligation and clean-up" section to specify 10 minute incubation for PromethION branch.
July 31st, 2024CDE_9162_v114_revR_29Jun2022EnglishGridion Download 18th April 2024 - Updated elution step in "Adapter ligation and clean-up" section to specify 10 minute incubation for PromethION branch.
April 18th, 2024CDE_9162_v114_revQ_29Jun2022EnglishFlongle Download 3rd January 2024 - Updated the protocol to a slimmed down template.
April 18th, 2024CDE_9162_v114_revQ_29Jun2022EnglishMinion Download 3rd January 2024 - Updated the protocol to a slimmed down template.
April 18th, 2024CDE_9162_v114_revQ_29Jun2022EnglishPromethion Download 3rd January 2024 - Updated the protocol to a slimmed down template.
April 18th, 2024CDE_9162_v114_revQ_29Jun2022EnglishGridion Download 3rd January 2024 - Updated the protocol to a slimmed down template.
January 3rd, 2024CDE_9162_v114_revP_29Jun2022EnglishFlongle Download 4th October 2023 - Updated the format of the final step in the "Adapter ligation and clean-up" step for the checklist
January 3rd, 2024CDE_9162_v114_revP_29Jun2022EnglishMinion Download 4th October 2023 - Updated the format of the final step in the "Adapter ligation and clean-up" step for the checklist
January 3rd, 2024CDE_9162_v114_revP_29Jun2022EnglishPromethion Download 4th October 2023 - Updated the format of the final step in the "Adapter ligation and clean-up" step for the checklist
January 3rd, 2024CDE_9162_v114_revP_29Jun2022EnglishGridion Download 4th October 2023 - Updated the format of the final step in the "Adapter ligation and clean-up" step for the checklist
October 4th, 2023CDE_9162_v114_revO_29Jun2022EnglishFlongle Download 19th September 2023 - Updated flow cell loading instructions to include light shield installation - Updated flow cell loading recommendations in the "Adapter ligation and clean-up" step.
October 4th, 2023CDE_9162_v114_revO_29Jun2022EnglishMinion Download 19th September 2023 - Updated flow cell loading instructions to include light shield installation - Updated flow cell loading recommendations in the "Adapter ligation and clean-up" step.
October 4th, 2023CDE_9162_v114_revO_29Jun2022EnglishPromethion Download 19th September 2023 - Updated flow cell loading instructions to include light shield installation - Updated flow cell loading recommendations in the "Adapter ligation and clean-up" step.
October 4th, 2023CDE_9162_v114_revO_29Jun2022EnglishGridion Download 19th September 2023 - Updated flow cell loading instructions to include light shield installation - Updated flow cell loading recommendations in the "Adapter ligation and clean-up" step.
September 19th, 2023CDE_9162_v114_revN_29Jun2022EnglishFlongle Download 1st August 2023 - Kit contents layout has been updated - In priming and loading the flow cell, the flow cell priming mix instructions have been updated
September 19th, 2023CDE_9162_v114_revN_29Jun2022EnglishMinion Download 1st August 2023 - Kit contents layout has been updated - In priming and loading the flow cell, the flow cell priming mix instructions have been updated
September 19th, 2023CDE_9162_v114_revN_29Jun2022EnglishPromethion Download 1st August 2023 - Kit contents layout has been updated - In priming and loading the flow cell, the flow cell priming mix instructions have been updated
September 19th, 2023CDE_9162_v114_revN_29Jun2022EnglishGridion Download 1st August 2023 - Kit contents layout has been updated - In priming and loading the flow cell, the flow cell priming mix instructions have been updated
August 1st, 2023CDE_9162_v114_revM_29Jun2022EnglishFlongle Download May 2023 - Added flow cell priming mix volumes to the "Priming and loading" steps - This kit has moved to released phase.
August 1st, 2023CDE_9162_v114_revM_29Jun2022EnglishMinion Download May 2023 - Added flow cell priming mix volumes to the "Priming and loading" steps - This kit has moved to released phase.
August 1st, 2023CDE_9162_v114_revM_29Jun2022EnglishPromethion Download May 2023 - Added flow cell priming mix volumes to the "Priming and loading" steps - This kit has moved to released phase.
August 1st, 2023CDE_9162_v114_revM_29Jun2022EnglishGridion Download May 2023 - Added flow cell priming mix volumes to the "Priming and loading" steps - This kit has moved to released phase.
April 28th, 2023CDE_9162_v114_revL_29Jun2022EnglishFlongle Download April 2023 - Added flow cell priming mix volumes to the "Priming and loading" steps
April 28th, 2023CDE_9162_v114_revL_29Jun2022EnglishMinion Download April 2023 - Added flow cell priming mix volumes to the "Priming and loading" steps
April 28th, 2023CDE_9162_v114_revL_29Jun2022EnglishPromethion Download April 2023 - Added flow cell priming mix volumes to the "Priming and loading" steps
April 28th, 2023CDE_9162_v114_revL_29Jun2022EnglishGridion Download April 2023 - Added flow cell priming mix volumes to the "Priming and loading" steps
March 15th, 2023CDE_9162_v114_revK_29Jun2022EnglishFlongle Download March 2023: - Updated the "Sequencing and data analysis" section to include further details about duplex basecalling
March 15th, 2023CDE_9162_v114_revK_29Jun2022EnglishMinion Download March 2023: - Updated the "Sequencing and data analysis" section to include further details about duplex basecalling
March 15th, 2023CDE_9162_v114_revK_29Jun2022EnglishPromethion Download March 2023: - Updated the "Sequencing and data analysis" section to include further details about duplex basecalling
March 15th, 2023CDE_9162_v114_revK_29Jun2022EnglishGridion Download March 2023: - Updated the "Sequencing and data analysis" section to include further details about duplex basecalling
January 6th, 2023CDE_9162_v114_revJ_29Jun2022EnglishFlongle Download January 2023 - Changed the "Priming and loading the PrometION flow cell" section to the updated version.
January 6th, 2023CDE_9162_v114_revJ_29Jun2022EnglishMinion Download January 2023 - Changed the "Priming and loading the PrometION flow cell" section to the updated version.
January 6th, 2023CDE_9162_v114_revJ_29Jun2022EnglishPromethion Download January 2023 - Changed the "Priming and loading the PrometION flow cell" section to the updated version.
January 6th, 2023CDE_9162_v114_revJ_29Jun2022EnglishGridion Download January 2023 - Changed the "Priming and loading the PrometION flow cell" section to the updated version.
November 30th, 2022CDE_9162_v114_revI_29Jun2022EnglishFlongle Download November 2022 - Updated kit name to Flongle Sequencing Expansion (EXP-FSE002)
November 30th, 2022CDE_9162_v114_revI_29Jun2022EnglishMinion Download November 2022 - Updated kit name to Flongle Sequencing Expansion (EXP-FSE002)
November 30th, 2022CDE_9162_v114_revI_29Jun2022EnglishPromethion Download November 2022 - Updated kit name to Flongle Sequencing Expansion (EXP-FSE002)
November 30th, 2022CDE_9162_v114_revI_29Jun2022EnglishGridion Download November 2022 - Updated kit name to Flongle Sequencing Expansion (EXP-FSE002)
October 27th, 2022CDE_9162_v114_revH_29Jun2022EnglishFlongle Download 27th October 2022 - Updated protocol to use 80% ethanol rather than 70% ethanol.
October 27th, 2022CDE_9162_v114_revH_29Jun2022EnglishMinion Download 27th October 2022 - Updated protocol to use 80% ethanol rather than 70% ethanol.
October 27th, 2022CDE_9162_v114_revH_29Jun2022EnglishPromethion Download 27th October 2022 - Updated protocol to use 80% ethanol rather than 70% ethanol.
October 27th, 2022CDE_9162_v114_revH_29Jun2022EnglishGridion Download 27th October 2022 - Updated protocol to use 80% ethanol rather than 70% ethanol.
October 4th, 2022CDE_9162_v114_revG_29Jun2022EnglishMinion Download 4th Oct 2022 - Updated kit 14 info sheet snippet and link
October 4th, 2022CDE_9162_v114_revG_29Jun2022EnglishPromethion Download 4th Oct 2022 - Updated kit 14 info sheet snippet and link
October 4th, 2022CDE_9162_v114_revG_29Jun2022EnglishGridion Download 4th Oct 2022 - Updated kit 14 info sheet snippet and link
August 18th, 2022CDE_9162_v114_revF_29Jun2022EnglishMinion Download 18th August 2022 - Updated kit contents image
August 18th, 2022CDE_9162_v114_revF_29Jun2022EnglishPromethion Download 18th August 2022 - Updated kit contents image
August 18th, 2022CDE_9162_v114_revF_29Jun2022EnglishGridion Download 18th August 2022 - Updated kit contents image
August 10th, 2022CDE_9162_v114_revE_29Jun2022EnglishMinion Download 10th August 2022 - Added specific concentration of BSA required for preparing the flow cell priming mix
August 10th, 2022CDE_9162_v114_revE_29Jun2022EnglishPromethion Download 10th August 2022 - Added specific concentration of BSA required for preparing the flow cell priming mix
August 10th, 2022CDE_9162_v114_revE_29Jun2022EnglishGridion Download 10th August 2022 - Added specific concentration of BSA required for preparing the flow cell priming mix
August 10th, 2022CDE_9162_v114_revD_29Jun2022EnglishMinion Download 10th August 2022 Updated phrasing used to add BSA to the flow cell priming mix and the use of ligation buffer
August 10th, 2022CDE_9162_v114_revD_29Jun2022EnglishPromethion Download 10th August 2022 Updated phrasing used to add BSA to the flow cell priming mix and the use of ligation buffer
August 10th, 2022CDE_9162_v114_revD_29Jun2022EnglishGridion Download 10th August 2022 Updated phrasing used to add BSA to the flow cell priming mix and the use of ligation buffer
August 10th, 2022CDE_9162_v114_revC_29Jun2022EnglishMinion Download 9th August 2022 - "Priming and loading the SpotON flow cell" has been updated to include the use of BSA for MinION and GridION flow cells
August 10th, 2022CDE_9162_v114_revC_29Jun2022EnglishPromethion Download 9th August 2022 - "Priming and loading the SpotON flow cell" has been updated to include the use of BSA for MinION and GridION flow cells
August 10th, 2022CDE_9162_v114_revC_29Jun2022EnglishGridion Download 9th August 2022 - "Priming and loading the SpotON flow cell" has been updated to include the use of BSA for MinION and GridION flow cells
July 21st, 2022CDE_9162_v114_revB_29Jun2022EnglishMinion Download 21st July 2022 - Updated the flow cell loading recommendations for MinION/GridION and PromethION.
July 21st, 2022CDE_9162_v114_revB_29Jun2022EnglishPromethion Download 21st July 2022 - Updated the flow cell loading recommendations for MinION/GridION and PromethION.
July 21st, 2022CDE_9162_v114_revB_29Jun2022EnglishGridion Download 21st July 2022 - Updated the flow cell loading recommendations for MinION/GridION and PromethION.
June 30th, 2022CDE_9162_v114_revA_29Jun2022EnglishMinion Download
June 30th, 2022CDE_9162_v114_revA_29Jun2022EnglishPromethion Download
June 30th, 2022CDE_9162_v114_revA_29Jun2022EnglishGridion Download